Model: K11 waterproof coating
Description
Product Origin: Zhejiang Yongkang
Product size: mass public
Product features: Asphalt, suitable for all kinds of waterproof engineering
Scope of application: Suitable for roof, interior and exterior walls, water pipe links, wall cracks, window edges, etc.
Product size: mass public
Product features: Asphalt, suitable for all kinds of waterproof engineering
Scope of application: Suitable for roof, interior and exterior walls, water pipe links, wall cracks, window edges, etc.
- Features
- Scope
- Technology
- Performance
- Notes
1. Anti-cracking, not afraid of building settlement
Due to the settlement and expansion of the house, the roof is cracked, so the waterproof construction should be coated with high flexibility.
2, high efficiency waterproof and impermeability pressure
Especially suitable for kitchen, bathroom, balcony, pool, etc.
3, factory direct sales, adequate supply
4, film formation is strong, not afraid of wind and rain
The exterior wall is often hit by heavy rain, and the ordinary waterproof coating is very effective in verifying the effect.
Due to the settlement and expansion of the house, the roof is cracked, so the waterproof construction should be coated with high flexibility.
2, high efficiency waterproof and impermeability pressure
Especially suitable for kitchen, bathroom, balcony, pool, etc.
3, factory direct sales, adequate supply
4, film formation is strong, not afraid of wind and rain
The exterior wall is often hit by heavy rain, and the ordinary waterproof coating is very effective in verifying the effect.
1. Clean the base surface without dust and sprinkle with a small amount of water to moisten.
2, open the lid to remove the material (two packs of powder two packs of liquid), 1:1 mixed construction.
3. Prepare two packs first, and mix them to make two packs. (Note: construction is careful to avoid measuring the body)
4. Brush the wall first for the first time, and then dry it for the second time. (Note: The adjusted paint should be used up as soon as possible to avoid precipitation)
2, open the lid to remove the material (two packs of powder two packs of liquid), 1:1 mixed construction.
3. Prepare two packs first, and mix them to make two packs. (Note: construction is careful to avoid measuring the body)
4. Brush the wall first for the first time, and then dry it for the second time. (Note: The adjusted paint should be used up as soon as possible to avoid precipitation)
Please wear gloves before use, please do not touch this product directly.
Keep out of reach of children and pets, and avoid prolonged contact between skin and liquids. Wear gloves or direct contact for too long. Rinse with plenty of water.
Do not use with other products, do not carry out construction when it rains.
The food is harmful and should not be placed in a place where children and pets can come into contact.
Keep out of reach of children and pets, and avoid prolonged contact between skin and liquids. Wear gloves or direct contact for too long. Rinse with plenty of water.
Do not use with other products, do not carry out construction when it rains.
The food is harmful and should not be placed in a place where children and pets can come into contact.